Topic on Talk:Platform Engineering Team/Event Platform Value Stream/Use case: Event Platform SDLC practices

Dependency arrows direction in Figure 2

2
GLederrey (WMF) (talkcontribs)

Nit: I tend to view arrows in a dependency diagram as meaning <<depends on>>. The figure 2 seems to use them with a meaning of <<is used by>>. This is slightly confusing to me.

GModena (WMF) (talkcontribs)

Ack.

Reply to "Dependency arrows direction in Figure 2"