Topic on Talk:Machine Learning

Weekly Team Update 2021-08-26

1
CAlbon (WMF) (talkcontribs)
  • We have Dockerized most of the ORES models for migration to Lift Wing.
  • We are working on connecting Lift Wing to the API Gateway, specifically deciding if we should do our own rate limited on our system and how we should do routing (i.e. if you swap out versions of a model, which side of the infrastructure (lift wing or the API gateway) is changed)
  • We are pushing forward on the Model Cards, next step is to make a single model card programmatically and put it in a repo on Gitlab. https://gitlab.wikimedia.org/htriedman/algo-accountability
  • Need to talk to procurement about GPUs, most likely we will need to install the new servers, then at a later date pull them out and put the GPUs in.
Reply to "Weekly Team Update 2021-08-26"