Wikimedia Apps/Team/iOS/Weekly Planning/2016-06-21

From mediawiki.org

06/21[edit]

Previous Action Items[edit]

- [RITA] Introduce Zeplin.io tool and discuss how we may incorporate it into the iOS process.

Agenda[edit]

- TSG

- Study

- when does the free period start)?

- can we collect demographic data in appsee?

- need a follow

- 5.0.5 status

- TSG to run regressions again today

- Crash rates for beta testers look really good so far

- Will make a final call by end of week, but looks like a Monday submit is likely

- Saturn scope (end of august)

- still like to deliver an update by end of summer with: nearby, ipad, find-in page and other smalls

- that is looking tight and without geo API changes a rich nearby experience is tough to justify

- might consider a smaller geo improvement (to make most recent nearby card update to actual current location) as a stopgap

- also seeing feed tech debt and user experience quality as higher priority

- contnue with current scope for now, but may move things around as we get info about LOEs and dependencies

- Out of scope:

- notifications

- new feed content (even if Android adds it)

- major navigation changes

- next tranche of work

- Feed focus

- random

- feed architecture and loading

- investigate viability/timeline for new endpoints

- find in page spike (how will we do it, technically?)

- Other work for 5.1

- Nearby estimations/technical feedback

- EMAIL FOR DISCOVERY

- iPad designs/scoping

- accessibility work

- austin

- reading lists

- dynamic type - work with design to change how we define text specs

- contrast

- localization visual tests/mock-ups

- Apple meeting

- In app purchases

- Release timelines shared doc

- Accessibility

- Other WWDC outcomes

Action Items[edit]

- Follow-up with Discovery about backend timelines for API changes, determine impact on shipping nearby in 5.1 [JOSH]

- File accessibiltiy tasks based on WWDC learnings [COREY]

- Groom board to reflect current priorities of feed work and find-in-page investigation [JOSH]

- Follow-up meeting to finalize plan and file initial tasks for feed study [JOSH]

- Spike to scope initial effort for Appsee integration [COREY]

- Review feed study doc here: https://docs.google.com/a/wikimedia.org/document/d/1HEgW4oho3O5LEWx-hdqZoLaElmH7l0tmUATFMk-cXfg/edit?usp=sharing [JOSH]

- Email about good design resources/process bits from WWDC [COREY]